Replacement of the elastomeric bearings involved the lifting of the bridge at the abutments and the free piers to enable installation. A temporary steel support jacking system was required at the free piers before the bridge could be raised. Four mechanical pot bearings were installed at each side of the 38 fixed piers.
ConsultantMunicipality of Beirut
LocationBeirut-Lebanon
Completion Date2016